The customer is a leading producer of nitrogen fertilizers and chemical products in Lithuania and across the Baltic states. The company operates large-scale industrial facilities where reliable water treatment solutions are essential to ensure stable production processes and equipment protection.
Challenge
The customer required an efficient and robust solution for the removal of iron from process water. The system had to ensure consistent water quality, operate reliably under industrial conditions, and integrate seamlessly into the existing infrastructure.
Solution
Savery Water engineered, manufactured, and installed a water de-ironing filtration system tailored to the customer’s operational requirements. The solution was designed to deliver stable performance, meet the required flow rates, and ensure efficient backwashing with minimal operational disruption.
Scope of Supply
- Engineering and system design
- Manufacturing of water de-ironing filters
- Installation and commissioning
| Parameter | Value | Units |
| Nominal capacity | 39 | m³/h |
| Min. water requirement for backwash | 20 | m³/h |
| Operating pressure range | 2.5–6.0 | bar |
| Temperature range | +5…+43 | °C |
Result
The installed water de-ironing filtration system ensures reliable iron removal, stable operation, and long-term performance. The solution supports the customer’s continuous production processes while meeting industrial water quality requirements.